top of page

LOW CARBON CITY MEDIA CENTRE

深圳低炭城媒體中心

SHENZHEN

深圳

2013

PROJECT DATA

​项目指标

SYSTEM

Frame System

 

COMPLETION DATE

2013.6

CONSTRUCTION PERIOD

Prefabrication 25 days

Assembly 16 hours

TOTAL FLOOR AREA

432 sqm.

CAPACITY

Flexible for office, showroom, education, exhibition, entertainment

COMFORT

Independent sun shading system, optimised daylighting & ventilation, integrated burglar grille, photovoltaic roofing module, built-in AC unit, demountable system

EQUIPMENT

LED lighting, unit bathroom

EARTHQUAKE RESISTANCE

(Mercalli Intensity Scale) Degree VIII

PROJECT TEAM

​项目团队

ARCHITECT

Zhu Jingxiang

DESIGN ASSISTANT

Lau Hingching, Han Guori, Wu Chenghui, Xia Heng, Liu Jie

PROJECT TEAM

Wu Chenghui, Xia Heng, Zhang Dongguang

TECHINICAL SUPPORT

Research Center of Yahgee Modular House Co., Ltd. (Dongguan)

ADMINISTRATION ASSISTANT

Peng Qiang, Rong Qianfei

bottom of page