top of page

Site
Introduction
This is a 20 years old village house in Tai Po.
Roof
Problem
The roof is ageing. Some floor tiles have peeled off, and the walls are mouldy. The indoor ceiling is mottled and seeps with water droplets.

Project Schedule
7 days for design; 14 days for purchase, manufacture and transportation; 8 days for on-site construction. Total project time: 1 month.
Price
Reference
The site area is about 700 square feet (70 square meters). 5mm thick sesame gray granite was used for ground tiles. The final price is about $HKD160,000.


Cooling Efficiency
Outdoor temperature (Roof): 33°C
Indoor temperature (below roof): 30°C
Indoor temperature (under new dry roof): 25°C
bottom of page